FAQs
Have a question related to our excavation services? We have the answer. Check out these FAQs and give us a call today for more information!
-
Our demolition crews take down detached garages, sheds, barns, mobile homes, decks, pools and full houses, and we clear the land afterwards so the lot is ready for whatever comes next. That includes disconnecting and capping utilities, separating debris for recycling where we can, hauling the rest away, and backfilling and grading the footprint. Commercial teardowns and partial demolition — taking out an interior, a wing or a foundation while the rest of the structure stays — are part of the same service.
-
Excavation is the part of a project that decides how well everything above it performs. We dig and shape foundations, basements, footings, utility trenches, driveways and building pads, and we set the grade so water leaves the structure instead of collecting against it. Because we also do grading, drainage and hauling, one crew handles the whole sequence rather than three contractors coordinating around each other.
-
Yes. Standing water, a soggy lawn, a wet basement or erosion channels across a driveway are all drainage problems, and the fix depends on where the water is coming from. We install French drains, trench drains, downspout and footing drain lines, swales, dry wells and culverts, and we regrade yards so surface water runs to somewhere sensible. We look at the whole property before recommending anything, because a drain that moves the problem 40 feet is not a fix.
-
Basement and foundation demolition is closer to excavation than to ordinary teardown work: the walls are below grade, the soil around them wants to move, and whatever is left has to be backfilled and compacted properly or the ground settles later. We break out and remove foundation walls and slabs, haul the concrete off, then backfill in lifts and regrade the area so it drains. Access, nearby structures and buried utilities all get checked before anything is broken.
-
Residential and commercial both, from a single-car garage to a multi-unit commercial teardown. Typical work includes houses, mobile homes, barns and outbuildings, in-ground pools, silos, concrete slabs and driveways, and selective interior demolition ahead of a renovation. If you are not sure whether a structure is a job for a demolition contractor or a remodeler, call and describe it — we will tell you plainly.
-
The method follows the site, not the other way around. We look at what the structure is made of, how close it sits to other buildings and property lines, whether hazardous material is likely, how debris will leave the site, and what has to remain standing. A rural barn with room around it is usually straight mechanical demolition; a structure tight against a neighbor's wall may need it taken apart in sections. You get the recommendation and the reasoning at the estimate, before anything is booked.
-
Land and lot clearing covers tree and stump removal, brush and undergrowth cutting, fence line clearing, and hauling the debris away or chipping it on site. It is most often the first phase of a build — clearing a house site, a pasture, a driveway route or a pond location — and we normally follow it straight into grading so the lot is left level and draining rather than just empty. Selective clearing, where specific trees stay, is a common request and no problem.
-
We start from your plans and the surveyor's stakes, strip and stockpile topsoil, then dig to the depth and dimensions the footing design calls for, allowing working room around the perimeter. The bottom is cut to grade and checked before footings go in, spoil is stockpiled or hauled off, and the site is left with positive drainage so rain does not sit in the hole. Once the foundation is up we come back to backfill, compact and finish grade.
-
It depends on size, soil, access and weather, but a straightforward residential basement dig is usually one to three days of machine time once we are on site. Rock, a high water table, tight access or a large footprint add to that. Scheduling is the bigger variable: we recommend reaching out two to three weeks before your target start date, and we will give you a realistic window at the estimate rather than an optimistic one.
-
It depends on the county and the job. Demolition of a structure generally needs a county demolition permit plus written confirmation that power, gas, water and septic have been disconnected, and older buildings may need an asbestos survey first. Excavation and land disturbance over a certain area triggers an erosion and sediment control permit — we are a Certified Responsible Land Disturber, so that requirement is covered. Anything in the public right-of-way, such as a driveway culvert on a state road, needs a VDOT permit. We tell you which apply to your project at the estimate.